Procedure to Rotate the System
- Physically clear the entire working area of all personnel and any obstructions.
- Attach air line.
- Verify that system is ay correct height for desired rotation.
- Slowly and smoothly engage the rotation control valve.
- Open air gate valve slowly but adequately to operate system, while rotating the system in the direction desired.
- As the system reaches the desired position, ease the air control valve off to a smooth stop.
ONLY when the system is safely at rest may personnel (re)enter the working area